Steps

A reed beds project follow few steps from the design until the construction. For all steps, the local authority follows and inspects the evolution of the project.

chantier.jpg

The on-site visite

·         Site survey by an AQUATIRIS’ engineer.

·         Topographical plan and percolation test.

·         Taking into account the integration with your landscape

The technical report

·         Design report: Existing data, retained project, design and plans.

·         User guide describing the principles of the Sanitation Garden® and the implementation condition

Construction proceedings

·         Linking with an installer certified by AQUATIRIS

·         Manufacturer’s control at the end of the construction carried out by the AQUATIRIS design office

 

And after the construction?

·         Sanitation Garden® are guarantee 10 years

·         Analytical follow up on request

·         Maintenance on request by one of our installers